Friday, July 8, 2022 Port Dalhousie
I’m still doing the perp walk from the boat to office to get any Wi-Fi at all. That’s my bitch today.
I haven’t heard if my water pump arrived yet. If it does, that will be my job tomorrow. If it doesn’t, I want to dismantle a few bars on the pushpit so I can access the dinghy and I should sort the anchors out. But the weather is supposed to be outstanding so my plans may get waylaid by an afternoon sail. I need to get at Canadian Tire:
- Plumbing tape
- A large wide slot headed screwdriver
- 25’ of dock line
My plans to go south in September are at risk. My doctor says I’m a prime candidate for both knees to be replaced and I have the same osteoarthritis in my L4 and L5 spine. My original plan was to make the decision on August 1. If the boat was ready, and I was ready, then September 1 I head to Oswego. The boat will be ready; the boat came to me almost ready, but I wonder if my knees will make single handing a serious problem. This is depressing but several things can happen.
- The wait list for knee replacements is 2 years. Why don’t I go and come back for the operation?
- I may find a travelling partner which would give us 4 legs to work the boat. I’d like that.
- I may settle in to for the winter here and look forward to the spring and a whole new plan.
- What else?
The next 6 weeks are important to this planning and stay tuned. It’s a beautiful boat and I plan many miles below the keel. Having the August 1 decision date means I don’t sweat the decision until that day. No worrying. Simply preparing and planning. It would be painful to worry every day about what to do. I’ll worry on August 1 and not before.
The pump did not arrive today. So I’m waterless for the weekend and don’t have that to install.
No responses yet